Commercial, Industrial, & Multi-Family Dwellings Permit Application Procedure
DO NOT CONTACT OR FILE ANY PAPERWORK WITH THE DEPARTMENT OF LABOR AND INDUSTRY FOR ACCESSIBILITY. ABI DOES ALL INSPECTIONS INCLUDING ACCESSIBILITY PLAN REVIEW AND INSPECTION. YOU WILL NEED TO CONTACT THE ELEVATOR AND THE BOILER & UNFIRED PRESSURE VESSEL DIVISION AS APPLICABLE AS WELL ANY OTHER STATE OR FEDERAL AGENCIES AS APPLICABLE TO YOUR PROJECT!
Failure to read and comply with the following document may result in a delay in the issuance of a building permit. It is to your benefit to carefully read ALL the following.
Per UCC Regulations, Administrative Section 403.43(k), it is not mandatory that the Code Official accept deferred submittals. In order to minimize costly design errors the permit applicant shall make every attempt to submit a full permit package. If due to seasonal concerns or other unforeseen circumstances the entire package is not available at the time of a permit application the design professional shall be required to follow all procedures as set forth under the Uniform Construction Code with regards to deferred submittals.
PA UCC Section 403.43(k)
(k) A building code official may allow deferred submittals of portions of the design of the building and structure from the time of the application until a specified time set by the building code official. All of the following apply to deferred submittals:
Three complete sets of building plans, signed and sealed by a registered design professional, shall be submitted showing all structural, architectural, site plot plans, electrical, energy/insulation (Com-Chek), plumbing, mechanical, fire detection, and fire suppression systems used in the construction. The cover page of all three sets of these plans shall indicate the applicable building code design criteria as adopted by the municipality. For example: IBC2003, IMC2003, 2002 NEC, etc. as well as design criteria such as wind speed, energy, seismic design, snow loads, etc. Work of a “minor” nature may be exempt from this requirement. Verify with the Code Official.
Per The Statewide Building Code UCC Administrative Regulation Section 403.46 - OCCUPANCY of any structure is prohibited until the receipt of a "Certificate of Use and Occupancy" is issued by the building code official. No Exceptions!
The information presented above is the basic requirements for commercial construction and is not to be relied upon for the complete requirements for commercial construction. It is to your advantage to use a design professional or a professional contractor to assist you with those areas of construction with which you are unfamiliar. Unfamiliarity with the building codes may cause unplanned delays and unforeseen costs to comply with building code regulations. Plan ahead!
I have read and agree to comply with the above information. (SEE NOTE BELOW regarding distribution of plans!)
________________________________________
Signature of Applicant or Responsible Party
________________________________________
Site Address of Proposed Construction
________________________________________
Date
Upon Plan Approval Three Sets of Stamped Plans Will Be Distributed as Follows:
Form Revised October 1, 2006/Rbm